RESUMES
Thomas
H. Strickland, P.E.
Mark
D. Strickland, P.E.
Brian
W. Strickland, P.E., P.L.S.
Shawn
J. Weber, P.E.
H. Elizabeth Long, P.E.
Terry
W. McCanless
Marcus
C. McElveen

|
E-mail: dlynn@stricklandengineering.com
David is responsible for civil engineering design and project
management. He has over 32 years experience in residential
and commercial site development; the design of streets, sanitary
sewers, and storm sewers; and storm sewers; and the preparation
of stormwater management plans. He has extensive experience
in watershed analysis and detention/retention basin design.
David joined Strickland Engineering in September 2002 after
relocating to the area from St. Louis.
Civil Engineering Course Work
St. Louis Community College
Washington University
Client: Saxony Lutheran High School
Location: Cape Girardeau County, Missouri
The project included planning and design of site layout, grading, sanitary sewer,
storm sewer and stormwater detention.
Project: Cambridge Estates Phase
II Subdivision
Location: Jackson, Missouri
The project included the design of a 13 lot residential subdivision
in the City of Jackson. Phase II of the subdivision contained
1,538 feet of sanitary sewer, 222 feet of storm sewer and
1,507 feet of water main.
Project: Clover Hill Estates
Location: Jackson, Missouri
Planning and design of a 102 lot (36 acres) residential subdivision
in Cape Girardeau County.
Project: South Central Correctional
Center
Location: Licking, Missouri
The project included planning and design of site layout, grading,
sanitary sewer, storm sewer and stormwater detention for an
eighty million-dollar, 1500 Bed, State Correctional Facility.
Project: Parkway West Senior High
School
Location: West St. Louis County,
Missouri
The project included design of improvements to an existing
stormwater retention facility to alleviate on site flooding.
Project: Aldis Facilities
Location: Missouri, Illinois and
Kentucky
The project included design of approximately 25 locations.
Design included site layout, grading, paving, sewer and detention
facilities.
Project: West Park Mall
Location: Cape Girardeau, Missouri
The project included design for 60+ acre retail shopping mall.
Design included site layout, grading, drainage, storm and
sanitary sewers.
Project: Battlefield Mall
Location: Springfield, Missouri
The project included design of improvements to an existing
stormwater retention facility to alleviate on site flooding.
Project: Metropolitan St. Louis
Sewer District
Location: Sanitary Relief Sewers,
Rockhill, Missouri
The project included analyzation of existing and projected
flows for watershed area, hydraulic modeling of watershed,
determining best alignment for sewer and sizing sewer main.
Project: Metropolitan St. Louis
Sewer District
Location: Sanitary Relief Sewers,
Overland, Missouri
The project included analyzation of existing and projected
flows for watershed area, hydraulic modeling of watershed,
determining best alignment for sewer and sizing sewer main.
|