Home | Services | Portfolio | Staff | Employment | Contact Us

Our Clients
Commercial
Industrial
Educational
Churches
Healthcare
Governmental

Our Disciplines
Mechanical Engineering
Electrical Engineering
Civil Engineering
Industrial Engineering
Building Design
Land Surveying

25 years of quality professional engineering and surveying services

Educational
For a complete list of our Educational clients. (PDF 46 KB)
Download Adobe Acrobat.

Highlighted Projects
Project: New Building for Saxony Lutheran High School
Client: Saxony Lutheran Schools
Location: Cape Girardeau County, Missouri
This project is being designed for a new regional high school building for the Saxony Lutheran Schools. The building includes classrooms, office suite, library, science and computer labs, kitchen chapel/common area, full gymnasium and locker room facilities. The facility includes rooftop HVAC systems with integral energy recovery. Strickland Engineering is providing the MPE engineering services to the project architect, Hoener Associates, St. Louis, Missouri. This project will be out for bid during November 2003 and is estimated to be constructed by December 2004. View Details.

Project: Elementary School Addition
Client: Immanuel Lutheran School
Location: Perryville, Missouri
This new school building addition of 27,000 sq. ft. K-8 grade classrooms, office suite, library, science and computer labs, full kitchen and cafeteria. The HVAC systems include individual fancoil units for each classroom and central fresh air system supplied through an energy recovery unit. Strickland Engineering provided the MPE engineering services for the project architect, PFAFF Partnership, St. Louis, Missouri. This project was completed in September 2003. View Details.

Other Projects
Project: HVAC Modifications for the West Lane Elementary School
Client: Jackson R-II School District
Location: Jackson, Missouri
This project included the replacement of the existing classroom unit ventilators with new energy efficient classroom units, the installation of new natural gas piping, and the replacement of the existing electric heating rooftop units with new gas-fired rooftop units for the entire building. This project was installed in phases with the district performing some of the labor and installation.

Project: New Elementary School
Client: Immaculate Conception Catholic School
Location: Jackson, Missouri
This new school addition was a Design-Build project with Dutch Enterprises, Jackson, Missouri for the plumbing and electrical work. This project was fast-tracked due to tornado damage in May 2003. This addition to the existing classroom building included an additional new 2-story classroom addition and a new gymnasium addition.

Project: HVAC Modifications for the Middle School/High School
Client: Arcadia Valley R-2 School District
Location: Ironton, Missouri
The modifications included the installation of a new computerized temperature control system and replacement of VAV boxes on three (3) of the existing rooftop HVAC systems. The control system is expandable to include the entire building at a future date. The project also included the service and repair of the existing rooftop units. This project was funded by the DESE Federal School Improvement Grant with the assistance of Strickland Engineering in the writing of the grant scope.

Project: Elementary and High School Maintenance Upgrades
Client: Clarkton School District C-4
Location: Clarkton, Missouri
The Maintenance Upgrades in the Elementary building included the installation the remodel of the main corridor and the renovation of the restrooms to comply with ADA. The Maintenance Upgrades in the High School building included the installation of new flooring in the classrooms and the renovation of the restrooms to comply with ADA. These projects were funded by the DESE Federal School Improvement Grant with the assistance of Strickland Engineering in the writing of the grant scope.

Project: Gym Roof/HVAC Replacement
Client: Nell Holcomb R-4 School District
Location: Cape Girardeau, Missouri
The gymnasium roof and HVAC replacement project included the addition of two 15-ton custom rooftop air conditioners with gas heating and the installation of a new single membrane rubber roofing system.

Project: Cafeteria HVAC Replacement
Client: Bernie R-XIII Schools
Location: Bernie, Missouri
This project included the HVAC replacement and upgrades for the school’s cafeteria building. The design included exposed double wall spiral ductwork, and three (3) separate HVAC units for the cafeteria and kitchen.

Project: Energy Audits
Client: Cape Girardeau Public Schools
Location: Cape Girardeau, Missouri
This project included the energy audits of Clippard Elementary, Jefferson Elementary, Franklin Elementary, and L. J. Shultz Seventh Grade buildings. These energy audits were the foundation to receiving DNR funding of energy related renovations and improvements. Computerized temperature control systems were a major item of the energy audits in all of the school buildings.

Project: Junior & Senior High School
Client: Advance R-IV School District
Location: Advance, Missouri
This new Junior and Senior High School project included the relocation of the existing district’s Junior and Senior High Schools to a new school campus. The new school included a new tournament gymnasium, vo-ag shop, library, science and computer labs, band and music classrooms, and home economics classroom. This building included masonry wall construction and flat rubber roof. The gymnasium and vo-ag shop included a pre-engineered metal building frame and roof construction. Team Four Architects were retained by Strickland Engineering to provide the architectural design on this project.

Project: Junior High School
Client: Nell Holcomb R-4 School District
Location: Cape Girardeau, Missouri
This new Junior High School building project was a new 12,000 sq. ft. pre-engineered metal building. This new Junior High School building included a new computer lab, science lab, library, office area, restrooms, and classrooms. Charles Herbst was retained by Strickland Engineering to provide the architectural design on this project.

Project: High School Renovations
Client: Meadow Heights R-II School District
Location: Patton, Missouri
This project included the renovation and upgrade of the existing high school building. This renovation included the addition of air conditioning to the entire facility, asbestos abatement, and the implementation of several energy conservation projects, including roof, window, and wall replacements. This project began as an energy audit to develop the project scope with the school board and administration. Alberson & Associates provided architectural design to Strickland Engineering on this project.