Project: Multi-Modal Transfer Facility
Client: Southeast Missouri State University
Location: Cape Girardeau, Missouri
Strickland Engineering
is providing the civil site design as a subconsultant to
HNTB Corporation for the proposed $12 million project.
Phase I of the project will include surface parking lots
and a terminal for the campus transit system with a budget
estimate of $4 million. Phase I also includes an access
road connecting the transfer facility and Show-Me Center
parking lots to the existing city street. Strickland Engineering
is responsible for design of the access road, driveways,
storm drainage, stormwater management, and utility connections
to the facility. View
Details.
Client: Village of Oak Ridge,
Missouri
Location: Oak Ridge, Missouri
Strickland Engineering is
providing engineering services for a wastewater collection
and treatment to provide sanitary sewer service to the Village.
The collection system will consist of approximately 120 residential
grinder pump units and a pump station for the school facilities.
The treatment system will consist of an aerated 3-cell lagoon. View
Details.
Project: Parking Lot Improvements
Client: Nell Holcomb School District
Location: Cape Girardeau, Missouri
The project involved the design of an access drive for buses
and 32-space employee parking lot totaling 2,484 square yards
of concrete pavement. The project is currently under contract
for $57,324.11. Construction is scheduled to begin in September.
Strickland Engineering prepared the construction documents,
provided bid phase services, and will provide construction
phase services.
Project: Site Improvements
Client: Ste. Genevieve County Memorial
Hospital
Location: Ste. Genevieve, Missouri
The project involved the design of a driveway and 20-space
employee parking lot totaling 1,314 square yards of asphalt
and concrete pavement. Also included was construction of a
concrete pad and relocation of electric service for a mobile
MRI unit that comes to the hospital two times per week. The
estimated construction cost of the project is $49,400.
Project: Parking Lot Improvements
Client: First Baptist Church
Location: Jackson, Missouri
The project involved the design of a 48-space parking lot
totaling 1,716 square yards of concrete pavement. The estimated
construction cost of the project is $35,400.
Back
to top 
Client: Saxony Lutheran High School
Location: Cape Girardeau County,
Missouri
Planning and design of a facultative lagoon wastewater treatment system to
serve the new high school. The system is designed for 10,500 gallons include
a three-cell lagoon, grinder pump station and 875 feet of force main.
Client: Clover Hill Estates
Location: Cape Girardeau County,
Missouri
Planning and design of a recirculating filter wastewater treatment and collection
system to serve a 102 lot residential subdivision in Cape Girardeau County.
The system is designed for 14,430 gallons per day and will include a 28,860
gallon septic tank, 14,430 gallon recirculating tank, twin 50’x60’ filter
beds, and 3,855 feet of sanitary sewer.
Client: Village of Boulder Creek
Location: Cape Girardeau County,
Missouri
Planning and design of
a recirculating filter wastewater treatment and collection
system to serve a 24-unit retirement community in Cape Girardeau County. The
system is designed for 2,400 gallons per day and will include a 2,400 gallon
recirculating tank, a 30’x32’ filter bed, and variable grade septic
tank effluent gravity collection sewer.
Project: Rosewood Interceptor
Sewer
Client: City of Jackson
Location: Jackson, Missouri
Strickland Engineering provided the planning and design of a new pump station
and trunk sewer extension to serve a developing watershed in the City of Jackson.
This project will extend gravity sewer and eliminate an existing grinder pump
station.
Client: Peaceful Valley Camp
Location: Ste. Genevieve County,
Missouri
Planning and design of
a recirculating filter wastewater treatment and collection
system to serve a 24-unit retirement community in Cape Girardeau County. The
system is designed for 2,400 gallons per day and will include a 4,800 gallon
septic tank, a 2,400 gallon recirculating tank, a 30’x32’ filter
bed, and 6” gravity collection sewer.
Project: Cambridge Estates Subdivision
Location: Jackson, Missouri
Planning and design of a 39 lot residential subdivision in the City of Jackson.
Phase I of the subdivision contained 2,187 feet of sanitary sewer. The sanitary
sewer extension from the existing City system to serve the subdivision consisted
of 1,814 feet of sanitary sewer, 2,126 feet of force main, and a pump station.
Project: Parkview Terrace Subdivision
Location: Jackson, Missouri
Planning and design of an 8 lot commercial subdivision in the City of Jackson.
The project includes extension of the City sewer system to the property and
replacement of the existing pump station serving the watershed.
Back to top 
Project: Commercial Street Channel
Improvements
Client: City of Cape Girardeau
Location: Cape Girardeau, Missouri
Strickland Engineering provided design and construction phase services for
the project that consisted of the improvement of approximately 1,600 feet of
drainage channel from South Kingshighway to the confluence with Cape LaCroix
Creek. Construction included earthwork, a new box culvert, addition of wingwalls
to the existing box culvert, concrete channel protection, concrete slope protection,
and asphalt pavement.
Project: Market Street Drainage
Study
Client: City of Ste. Genevieve
Location: Ste. Genevieve, Missouri
Strickland Engineering performed a study of a watershed in which the City was
experiencing problems. Services included conducting a field survey, determining
the capacity of the existing storm sewer system, and proposing improvements
with construction cost estimates.
Back to top 
Project: Cambridge Estates
Location: Jackson, Missouri
Planning and design of a 39 lot (37 acres) residential subdivision in the City
of Jackson.
Project: Parkview Terrace
Location: Jackson, Missouri
Planning and design of an 8 lot residential subdivision in the City of Jackson.
Project: Clover Hill Estates
Location: Cape Girardeau County,
Missouri
Planning and design of a 102 lot (36 acres) residential subdivision in Cape
Girardeau County.
Project: Country Pines
Location: Cape Girardeau County,
Missouri
Planning and design of an 11 lot (22 acres) residential subdivision in Cape
Girardeau County.
Project: Friedman Addition
Location: Ste. Genevieve, Missouri
Planning and design of an 8 lot commercial subdivision in the City of Ste.
Genevieve.
Project: Windwood Village 2nd
Location: Ste. Genevieve, Missouri
Planning and design of a 2 lot commercial subdivision in the City of Ste. Genevieve.
Back to top 
Project: Deerwood Drive Preliminary
Alignment
Client: City of Jackson
Location: Jackson, Missouri
Strickland Engineering provided
a preliminary horizontal alignment of Deerwood Drive from
US Highway 61 to Greensferry
Road. Deerwood Drive is a collector
street on the City’s major street plan that will serve as a northern
bypass connecting Greensferry Road, US Highway 61, and MO Route D. The City
was able to obtain right-of-way for the eastern half of the US Highway 61/Deerwood
Drive intersection as part of a friendly annexation.
Project: International Subdivision
Street Improvements
Client: City of Ste. Genevieve
Location: Ste. Genevieve, Missouri
Strickland Engineering is providing preliminary engineering to develop a phasing
plan to develop a capital improvements program to replace approximately 7,881
lineal feet of existing street pavements within the subdivision. The improvements
will include construction of a 32-feet wide pavement section and stormwater
drainage.
Project: Multi-Modal Transfer
Facility
Client: Southeast Missouri State
University
Location: Cape Girardeau, Missouri
Strickland Engineering is providing the civil site design as a subconsultant
to HNTB Corporation for the proposed $12 million project. Phase I of the project
includes an access road connecting the transfer facility and Show-Me Center
parking lots to the existing city street. Strickland Engineering is responsible
for design of the access road, driveways, storm drainage, stormwater management,
and utility connections to the facility.
Project: Southern Expressway
Extension
Client: City of Cape Girardeau
Location: Cape Girardeau, Missouri
Approximately 2,800 feet in length from South Kingshighway to Silver Springs
Road. Construction of a 48-feet wide concrete pavement section, storm water
drainage, storm water detention, and modifications to the existing signalized
intersection at South Kingshighway.
Project: Independence Street
Reconstruction
Client: City of Cape Girardeau
Location: Cape Girardeau, Missouri
Approximately 1,000 feet in length from Pacific Street to Sprigg Street. The
Independence/Pacific Street intersection will be reconstructed to improve drainage.
The remainder of the project consists of curb and gutter replacement, surface
milling and asphalt overlay, and sidewalk replacement.
Back to top 
Project: Water Main Extension
Client: Saxony Lutheran High School
Location: Cape Girardeau County,
Missouri
Design of 6” water
main (3,800 feet) to extend service of the Public Water
Supply District No. 1 to the new high
school campus in Cape Girardeau
County.
Project: Water Supply Well #7
Client: City of Jackson
Location: Jackson, Missouri
Design of an 8” water main extension from the end of the City’s
system to the new water supply well #7 in the North Industrial Park.
Project: Water Main Extension
Client: Clover Hill Estates
Location: Cape Girardeau County,
Missouri
Design of 6” water
main to extend service of the Public Water Supply District
No. 1 to a 102 lot residential subdivision in Cape Girardeau
County.
Client: County Pines Subdivision
Location: Cape Girardeau County,
Missouri
Design of 4” water
main to extend service of the Public Water Supply District
No. 1 to an eleven lot residential subdivision in Cape
Girardeau County.
Project: Warren Place Water Main
Extension
Client: City of Jackson
Location: Jackson, Missouri
Design, contract administration,
and construction observation of the installation of approximately
500 feet of an 8” water main extension to serve Warren
Place Subdivision.
Project: Water System Improvements
Client: City of Jackson
Location: Jackson, Missouri
Provided topographic and
property survey for Burns & McDonnell of proposed
corridors for the design of approximately 49,500 feet of new water mains.
Project: Toll Road Water Main
Client: Chug Crites
Location: Jackson, Missouri
Design of a 6” water
main extension to serve property annexed by the City of
Jackson along Toll Road.
Project: Water Main Extension
Client: North Hills Subdivision
Location: Cape Girardeau County,
Missouri
Design of 10, 450 feet
of 6” water main to extend service of the Public
Water Supply District No. 1 to North Hills Subdivision in Cape Girardeau County.
Client: Nottingham Subdivision
Location: Cape Girardeau County,
Missouri
Design of 800 feet of
6” water main to extend service of the City of
Cape Girardeau to Nottingham Subdivision in Cape Girardeau County.