Perryville, Missouri
 |
Architect:
Pfaff Partnership, Inc.
St. Louis, Missouri
Owner:
Immanuel Lutheran School
Perryville, Missouri
General Contractor:
Brockmiller Construction, Inc.
Farmington, Missouri
Construction Cost:
$2.2 Million (MPE = $650,000)
Construction Completed:
September 2003 |
Strickland Engineering was the MPE Engineering Consultant
for this new 27,000 sq. ft. building addition to the Immanuel
Lutheran Elementary School in Perryville, Missouri.
The building
addition includes classrooms, office suite, library, science
and computer labs, full kitchen and cafeteria.
The building is attached to the school’s existing gymnasium
and locker room facilities.
The MPE system design for this
project includes individual HVAC fancoil units in each
classroom and central fresh air
system supplied through energy recovery units, rooftop
HVAC units for the central areas, provisions to add air conditioning
to the existing gymnasium, fire protection system for the
new addition, electrical service for the addition and the
existing gymnasium, site lighting, and a complete fire
alarm
system.
|