Fruitland, Missouri

|
Architect:
St. Louis Design Alliance
St. Louis, Missouri
Owner:
Fruitland Community Church
Fruitland, Missouri
|
General
Contractor:
Church was built by Volunteers
Construction Completed:
October 2001
|
  |
Strickland Engineering was the MPE and Civil Engineering
Consultant for this new 12,000 sq. ft. church facility on
Highway 61 in Fruitland, Missouri. The facility included
a multipurpose room with seating for 200 during worship,
foyer/café, kitchen, offices, classrooms, and a community
room. The church acted as the General Contractor and built
the church with volunteer labor.
The Civil design included master planning of the 10-acre
site and design of Phase 1 improvements. Phase 1 included
site grading, paving, and site utilities. The master plan
included future classroom and auditorium additions, parking
lot expansion, and recreation fields.
The MPE system design for this project included split system
HVAC units, a rooftop energy recovery unit for the central
exhaust system, kitchen hood exhaust system, and lighting
control system.
|